
25
A4 Operating Sequence
Step 3
Concrete the slab.
Fold up the Slab Anchor Template.
Rework slab.
Assemble subsequent guardrails.
Step 4
Mount top Slab Shoe.
Strip slab formwork and back-prop.
Open cover flaps.
Climb climbing enclosure hydraulically
(as depicted above) or by crane.
Dismantle bottom Slab Shoe.
Fig. A4.03
Fig. A4.04
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...