
8
10.1
8
10.3
10.2
10
Ø 21
Ø 21
Ø 26
Ø 26
70
Fig. C1.04a
Fig. C1.04
Version 2 and 3
with Crossbar RCS 103:
Attach the Crane Eye BR-2 2.5 t to the
Crossbar 103 RCS.
Components
8
Crane Eye BR-2 2.5 t
10
Crossbar RCS 103
10.1
Hex. Bolt ISO 4014 M 20x90-8.8
10.2
Nut ISO 4032 M20-8
10.3
Lug
Assembly
1. Attach Crane Eye BR-2 2.5t (8) with
the provided bolts M20x90-8.8 (94)
and nuts M20-8 (95) to the lug (10.3)
of the Crossbar RCS 103 (10).
Has the nut been tightened?
Permissible load per Crane Eye BR-2
2.5 t: max. 25 kN.
For moving heavy climbing units, use
Lifting Beam 9 t.
Follow Instructions for Use at all times!
C1 Pre-Assembly of Brackets
RCS P Climbing Protection Panel
Instructions for Assembly and Use - Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...