
66
C1 Pre-Assembly of Brackets
General
For pre-assembly, there must be a suf-
ficiently large and level assembly area
available, as well as sufficient space
for intermediate storage.
A crane or other lifting equipment is
required.
Any intermediate status is to be cor-
rectly secured by means of temporary
supports to prevent any tipping over.
Assembly is carried out on aligned
timbers.
Preparation of the Climbing
Rails
Position Climbing Rails RCS on tim-
bers. Observe centre of gravity posi-
tion with the Enclosure Post.
Note
Risk of collision!
Only use the specified bolt lengths and
nuts.
Mounting the Spacer M20
In some cases, the additional installa-
tion of a Spacer M20-82 (3) may be
required as a Climbing Bolt in the
Climbing Rail, see "Additional Spacers"
on Page 32.
Components
3
Spacer M20-82
3.1
Spacer Tube Ø26.9×2.6 82
3.2
Bolt ISO 4014 M20 x 120-8.8
3.3
Nut ISO 7042 M20-8
RCS P Climbing Protection Panel
Instructions for Assembly and Use - Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...