
47.6
123
24 + 26
2
110
D1 Suspension and Anchoring
Bracing the Corner Elements
Install temporary bracing in the case of
expected wind speeds of more than
100 km/h.
Components
2
Climbing Rail RCS
24
Fitting Pin Ø 21 x 120
26
Cotter Pin 4/1
47.6
Tie Rod DW 15, Special Length
117
Heavy-Duty Dowel Ø 22
118
Heavy-Duty Dowel Ø 30
119
Hex. Nut DW 15 SW 30/50
122
Bracing Shoe RCS DW 15
123
Eye Nut RCS DW 15
125
Articulated Spanner RCS DW 15
Assembly:
1. Turn Tie Rod (47.6) in the eye nut
(123) (Fig. D1.09a)
2. Connect Tie Rod to Articulated Span-
ner (125) by means of nut DW 15
(119).
3. Mount eye nut (123) in the Climbing
Rail RCS (2) using the fitting pin
Ø 21 x 120 (24) and cotter pin (26)
whilst standing on the platform.
4. Connect Articulated Spanner (125) to
the Bracing Shoe RCS DW15 (122)
with the fitting pin. (Fig. D1.09b)
Fig. D1.09
Fig. D1.09a
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...