
41.1
138
138.1
41
80
138
139
≤ 2
0
81
C2 Assembly of the Working Platforms
3. Cut the multi-layer plywood sheeting
(41.1) to required size and pre-drill
with Ø 11 mm.
4. Mount Flap Hinges (138) with the
provided bolts M10x50-8.8 (138.1)
and washers. Permissible arrange-
ment, see "Fig. B2.06" on page 46
and "Table B2.02" on page 46.
5. Mount the foldable cover (41) on the
scaffold tube (80) and place on the
reinforcing bar (150).
6. For each foldable cover, mount at
least one Flap Safety Plate (42) ap-
proximately in the centre using 2
SPAX Screws TX 30 8x20. Foldable
cover is now secured. (Fig. C2.04)
Fig. C2.04
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...