
13.4
B
13
1
12,5
6,25
A
6
23
85
C3 Assembly of the Enclosure
Mounting the
Enclosure Beam
The Enclosure Beams (timbers) ensure
the required axial dimension A of the
Bracket Unit during bracket assembly.
Use the dimensions specified in the
site-specific assembly drawings!
Components
1
Climbing Rail RCS
13
Timber Fixation RCS 12/20
13.4
Drilled hole
14
Enclosure Beam (timber)
23
Plate Connector Ø 48/12 mm
90
Bolt ISO 4017 M12 x 140-8.8
91
Bolt ISO 4017 M12 x 240-8.8
96
Nut ISO 4032 M12-8
97
Washer ISO 7093 200HV, A12
Assembly
1. Carry over the position of bracket
axes A to the Enclosure Beam and
mark drilled holes B which corre-
spond to Fig. C3.03.
2. Place Timber Fixation (13) in the sub-
sequent mounting position as drilling
jig. Drill through timber with Ø 12
mm. (Fig. C3.03)
3. If statically required: hammer in Plate
Connectors (23) congruently into the
holes of the Enclosure Beam, on the
side of the Timber Fixation. Secure
Plate Connectors with wire nails.
(Fig. C3.01)
4. Depending on the clamping length
(timber height), insert bolts M12 x
140 (90) or M12 x 240 (91) through
the holes of the Timber Fixation and
Enclosure Beam. Secure bolt with
washer (97) and nut (96).
(Fig. C3.01)
Fig. C3.03
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...