B1 Planning the Supporting Structure
Framework Assembly
General
Depending on the assembly version,
install different framework components
between the Climbing Rail (2) and En-
closure Post (1).
The Bolts ISO 4014 M24 x 130-8.8 and
Nuts ISO 7040 M24-8 that are provided
are to be used.
Climbing Rail spacings
The spacing between the Climbing
Rails is determined and proven on a
project-specific basis.
The respective dimensions for the as-
sembly are based on the specified de-
sign and must be included on separate
assembly drawings. All separate con-
necting means which are not standard
PERI components must be identified.
Version 1
(Fig. B1.04)
Components
1
Enclosure Post
2
Climbing Rail
4
Spacer M24-82
11
Crossbar RCS 69
Offset dimension of the Spacers in
the Climbing Rail and Enclosure
Post: 125 mm.
The Crossbar RCS 69 is used as a
horizontal Platform Beam and as a
diagonal truss strut.
In the arrangement shown, a Spacer
must be moved in the Climbing Rail.
See Section "Additional Spacers" on
page 32.
Fig. B1.04
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...