1-57
1
1
9. HOW TO INSTALL THE INDOOR UNIT
<Type E2>
9-1. Required Minimum Space for Installation and Service
(1) Dimensions of suspension bolt pitch and unit
(60)
(60)
20
0
1100
67
67
1310
964
1070
13
2
45
1310
1334 1453
467
65
77
479
264
27
1100
67
67
131
0
96
4
(60)
(60)
1070
13
2
45
1 2
6
1138
46
7
422
7
8
32
0
41
43
4
10
0
10
0
60
1220
156
131
207
45
43
10
0100
50
30
0
40
47
9
23
1205
131
0
1334
1453
467
65
77
479
264
27
3
5
4
1200
1170
1170
1200
Fig. 1-23
9 ×100 pitch = 900
(Suspension bolt pitch
)
4-37×12 hole
(For suspension bolt)
Electrical component box
28-ø3.2 hole
26-ø3.2 hole
(Suspension bolt pitch)
10 ×100 pitch = 1000
Unit : mm
1
Refrigerant liquid tubing (Flare) Type 200: ø9.52
Type 250: ø12.7
2 Refrigerant gas tubing (Brazing) ø25.4 mm
3 Power supply port
4 Communication wiring port
5 Port for optional wiring part
6 Drain port 25A
7 Air intake duct connecting side flange
8 Air discharge duct connecting side flange
Fig. 1-24
For
communication
wiring port
For power supply
wiring port
Min. 800
(Space for service
)
Electrical
component box
* Space for removing
drain pan
(2) Dimensions of Indoor unit
Type 200 / 250
Inspection access (600 × 600)(Field supply)
Ceiling face
Inspection access (600 × 600)(Field supply)
Min. 1100
(Space for service)
(Suspension bolt pitch)
Min. 610*
(Space for
service)
Min. 60
0
(Space for
service
)
(Suspension bolt pitch
)
Drain
port Refrigerant
tubing joint
Port for
optional
wiring part
Unit: mm
9-2. Suspending the Indoor Unit
Depending on the ceiling type:
1. Check the suspension bolt pitch.
2. Ensure that the ceiling is strong enough to support the weight of the unit.
3. To prevent the unit from dropping, firmly fasten the suspension bolts as shown in the figure below.
L*
20 ~ 50
Hole-in-anchor
Hole-in-plug
Insert
Unit: mm
Concrete
Suspension bolt
(field supply)
Hexagonal nut (field supply)
Special washer (field supply)
Special washer (field supply)
Hexagonal nut (field supply)
Suspension bolt (field supply)
Hexagonal nut (field supply)
Special washer (supplied)
Suspension lug
* Choose “L” dimension according
to the status of the ceiling.
Fig. 1-25
Fig. 1-26
NOTE
Type
Suspension bolt (field supply)
200
M10 or 3/8”
250
M10 or 3/8”
It is important that you use extreme care in supporting the indoor unit inside the ceiling.
Ensure that the ceiling is strong enough to support the weight of the unit.
Before suspending the unit, test the strength of each attached suspension bolt.
(1) When placing the unit inside the ceiling, determine the pitch of the suspension bolts referring to the dimensional
data given previously. Tubing must be laid and connected inside the ceiling when suspending the unit.
If the ceiling is already constructed, lay the tubing into position for connection to the unit before placing the unit
inside the ceiling.
(2) Screw in the suspension bolts allowing them to protrude from the ceiling as shown in Fig. 1-25. (Cut the ceiling
material, if necessary.)
(3) Suspend and fix the indoor unit using the 2 hexagonal nuts (field supply) and special washers (supplied with the
unit) as shown in Fig. 1-26.
•
The top of the unit must be installed horizontally.
•
Check the unit is placed horizontally.
Make sure the unit is installed level using a level or a vinyl hose
filled with water.
In using a vinyl hose instead of a level, adjust the top surface of
the unit to the surface of the water at both ends of the vinyl hose
and make horizontal adjustment on all 4 corners of the unit.
If the air discharge side of the unit is installed downward,
splashing water or water leak may occur.
Also, the dust may accumulate inside the drain pan caused by
draining residual water.
• W
hen lifting the unit, do not attempt to hold the electrical
component box in hand.
•
Do not leave the drain pan of the unit downward for long hours.
If doing so, the insulation material can be crushed.
Crushed insulation can lead to condensation.
Horizontal
level
Vinyl hose filled with water
Carpenter’s level
Electrical component box
Drain pan
Vinyl hose filled
with water
Insulation
material
WARNING
CAUTION
Sec1.indd 57
2014/11/07 10:28:05
Summary of Contents for S-200PE1E8
Page 88: ...1 82 MEMO ...
Page 112: ...3 2 3 3 1 Outdoor Units Electric Wiring Diagram U 200PE1E8 U 250PE1E8 ...
Page 113: ...3 3 3 Schematic Diagram U 200PE1E8 U 250PE1E8 ...
Page 115: ...3 5 3 3 2 Indoor Units High Static Pressure Ducted Type S 200PE1E8A Electric Wiring Diagram ...
Page 116: ...3 6 3 3 2 Indoor Units High Static Pressure Ducted Type S 200PE1E8A Schematic Diagram ...
Page 117: ...3 7 3 3 2 Indoor Units High Static Pressure Ducted Type S 200PE1E8 Electric Wiring Diagram ...
Page 118: ...3 8 3 3 2 Indoor Units High Static Pressure Ducted Type S 200PE1E8 Schematic Diagram ...
Page 119: ...3 9 3 3 2 Indoor Units High Static Pressure Ducted Type S 250PE1E8 Electric Wiring Diagram ...
Page 120: ...3 10 3 3 2 Indoor Units High Static Pressure Ducted Type S 250PE1E8 Schematic Diagram ...
Page 129: ...4 9 4 4 3 Outdoor Unit Filter PCB FIL C906VH8 ...
Page 130: ...4 10 4 4 4 Outdoor Unit HIC Board HIC C906VH8 ...
Page 136: ... MEMO 4 16 ...
Page 154: ... MEMO 5 18 ...
Page 164: ... MEMO 6 10 ...
Page 180: ... MEMO 7 16 ...
Page 197: ...201411 ...