92
4-6 Basic Control Timing Chart
ンㄆㄇㄆㄓㄆㄏㄆ
• ON/OFF on the timing chart refers to ON/OFF operations. It does not refer to the voltage level (High/Low).
• In the following timing charts, the timing of output operation corresponding to the each input has a small delay of 0ms or
more.
4-6-1 Flow from startup to marking
T1
T5
T2
T4
T4
T7
T6
T3
T3
T3
T3
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
(Open)
(Close)
ON
OFF
(Open)
(Close)
ON
OFF
(Normal)
(Error)
ON
OFF
(Normal)
(Error)
REMOTE IN (X4)
*1
LASER SUPPLY IN (X6)
SHUTTER ENABLE IN (X9)
SHUTTER IN (X8)
TRIGGER IN (X5)
SYSTEM STANDBY OUT
(Y7)
REMOTE OUT (Y4)
LASER STANDBY OUT (Y6)
ALARM OUT (Y15)
WARNING OUT (Y14)
READY OUT (Y5)
PROCESSING OUT (Y10)
LASING OUT (Y20)
PROCESSING END OUT
(Y11)
SHUTTER OPEN 1 OUT (Y8)
SHUTTER OPEN 2 OUT (Y9)
Key switch
*1 : Turn off the key switch with the laser pumping turned off or with the shutter closed.
ME-LPGS-SM-8
Summary of Contents for LP-GS Series
Page 17: ...1 Product Overview ME LPGS SM 8 ...
Page 32: ...2 Laser Marker Installation ME LPGS SM 8 ...
Page 48: ...3 Operation Method ME LPGS SM 8 ...
Page 68: ...4 External Control Using I O ME LPGS SM 8 ...
Page 107: ...5 External Control by Communication Commands ME LPGS SM 8 ...
Page 116: ...6 Link Control with External Devices ME LPGS SM 8 ...
Page 141: ...7 Maintenance ME LPGS SM 8 ...
Page 161: ...161 MEMO ME LPGS SM 8 ...
Page 162: ...Troubleshooting ME LPGS SM 8 ...
Page 186: ...Index ME LPGS SM 8 ...
Page 189: ......
Page 190: ... Panasonic Industrial Devices SUNX Co Ltd 2014 2019 April 2019 ...