88
2. Radiate the laser for marking
1.
Press the laser pumping switch on the controller.
The laser pumping switch will be flashing in white. When the switch
is changed from flashing to lightning up, the laser marker is ready for
radiation.
(Flashing time: approx. 20sec.)
2.
Select [TEST] of the marking mode.
3.
The marking is started by pressing [START].
WARNING
•
The laser beam is emitted. Be sure to use the protective goggle and enclosure
while dealing with the laser.
Flashing to
lightning
ME-LP400V-OP-6
Summary of Contents for LP-400 Series
Page 11: ...11 MEMO ME LP400V OP 6 ...
Page 32: ...32 1 Product Overview ME LP400V OP 6 ...
Page 58: ...2 Installation and Connection ME LP400V OP 6 ...
Page 77: ...3 Basic Operation Procedure ME LP400V OP 6 ...
Page 121: ...4 Description of Operation Screen ME LP400V OP 6 ...
Page 146: ...146 Symbol ME LP400V OP 6 ...
Page 271: ...271 MEMO ME LP400V OP 6 ...
Page 272: ...Maintenance ME LP400V OP 6 ...
Page 291: ...Troubleshooting ME LP400V OP 6 ...
Page 308: ...Appendix ME LP400V OP 6 ...
Page 328: ...Index ME LP400V OP 6 ...
Page 333: ...No 9000 0062 14V ...
Page 334: ... Panasonic Industrial Devices SUNX Co Ltd 2003 2018 July 2018 9000 0062 14V ...