
PREVENTIVE MAINTENANCE SCHEDULE
PART 8: MAINTENANCE AND SERVICE
– 158 –
Y53-6032
(R05/10)
Electrical &
lights
Power supply harnesses
(engine, transmission, etc.)
Check for worn or damaged insulation, corroded terminals, frayed wires,
and oil or fluid leaks on the connectors or wiring.
X
Power supply harnesses
(engine, transmission, etc.)
Wash to remove excess grease.
X
Cab struc-
ture, doors,
& hoods
Hood
Lubricate the lower hood pivot (only if lube fittings are present).
X
Hinges and latch
Lubricate with silicone spray.
X
Body & cab holddown bolts
Check the condition and tightness.
X
Heating &
Air Condi-
tioning
Air conditioner
Operate the system. (NOTE: The air conditioning system is active when the
Defrost/Defog mode is selected.)
X
Heater & air conditioner
Perform the checks listed on
page 215
.
X
Full operational and diagnostic check.
X
Cab air filter
Clean; replace after a maximum of three cleanings.
X
Condenser
Clear any debris from the front of the condenser.
X
Aftertreat-
ment Sys-
tem
System
Check for leaks and proper support (see
page 213
).
X
Flexible pipe
Replace the main and anciliary exhaust flexible pipe.
150,000 mi/241,401 Km
Table 2
Preventative Maintenance Schedule (Continued)
SYSTEM
COMPONENT
MAINTENANCE TASK
Recommended
PM Interval
I
A
B
C
D
E
Y53-6032.book Page 158 Monday, May 24, 2010 3:37 PM
Summary of Contents for Peterbilt 587
Page 1: ......