PART 8: MAINTENANCE AND SERVICE
PREVENTIVE MAINTENANCE SCHEDULE
(R05/10)
Y53-6032 –
155
–
Power
Steering
Steering linkage
Check all joints for excessive lash; replace as required (see
page 207
).
X
Draglink tube clamp and ball
socket
Check the torque; tighten to specified torque value as required.
X
X
Pitman arm clamp bolt and
nut
Check the torque; tighten to specified torque value as required.
X
X
Steering intermediate shaft
Check the torque on the pinch bolt and nut.
X
X
Steering intermediate shaft
U-joints (ON HIGHWAY)
Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C to
-23° C) range].
X
X
Steering intermediate shaft
U-joints (OFF HIGHWAY or
CITY DELIVERY)
Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C to
-23° C) range].
X
X
Draglink and tie rod arm ball
sockets (ON HIGHWAY)
Lubricate (EP NLGI #2 lithium-based, moly-filled, HD grease).
X
X
Steering intermediate shaft
U-joints (OFF HIGHWAY or
CITY DELIVERY)
Lubricate (EP NLGI #2 lithium-based, moly-filled, HD grease).
X
X
Fuel &
Tanks
Fuel tanks
Inspect tanks, brackets, hoses, and fittings for correct location, tightness,
abrasion damage, and leaks; repair or replace as required.
X
Fuel tank breathers
Check for proper function; clean the drain hoses.
X
Table 2
Preventative Maintenance Schedule (Continued)
SYSTEM
COMPONENT
MAINTENANCE TASK
Recommended
PM Interval
I
A
B
C
D
E
Y53-6032.book Page 155 Monday, May 24, 2010 3:37 PM
Summary of Contents for Peterbilt 587
Page 1: ......