
Chapter 2
Initiate Guided Maintenance
16
Pillar Data Systems Confidential
Fail Back the Control Unit (Optional)
If you have not selected Enable Automatic Recovery, this
procedure becomes Step 4 of Guided Maintenance in which
failback is manually controlled. However, if you have selected
Enable Automatic Recovery, Guided Maintenance
automatically fails back the target Slammer CU from its
partner.
You can override automatic failback by not selecting the
Enable Automatic Recovery option. When this option is not
selected, Guided Maintenance displays the Resume button
to allow you to control manually when the failback occurs.
To fail back the control unit (CU) from its partner, click the
Resume button.
Verify The Status of the Replacement FRU
In all cases of FRU replacement (other than that for bezels),
after you have replaced a FRU, Guided Maintenance:
• Displays the Verify page.
• Continually probes the FRU for its status.
When all is well, Guided Maintenance reports a Normal
status for the FRU.
Note: Guided Maintenance continues to probe for status until
the Verify page is closed.