Index
282
Oracle Server X6-2 Service Manual • June 2016
video connector, 198
ports
Ethernet, 195
Gigabit Ethernet, 195
network management
See
NET MGT
serial management, 197
serial management (SER MGT), 197
video, 198
POST code checkpoint tests, 194
power
power down server
gracefully, 51
power supply
description, 20
installing, 83
removing, 81
power unit components, 257
power, FIM, disk backplane data, and DVD cables
installing, 184
removing, 182
power-on self-test (POST) code checkpoint tests, 29
Power/OK indicator, 29
powering off the system, 51
processor components, 258
processor removal and replacement tool
processor(s)
release lever
disengaging, 128
removal and replacement tool, 132
processors
identifying failed, 125
installing, 131
removing, 125
PSU
See
power supply
R
rackmount
removing
antistatic measures, 190
battery, 116
fan modules, 76
FIM, 159
internal HBA card, 141
motherboard, 162
NVMe cables, 178
Oracle PCIe NVMe switch card, 138
power supply, 81
power, FIM, disk backplane data, and DVD
cables, 182
storage drive, 66
S
safety
SAS drive cables
installing, 176
removing, 173
screens, BIOS Setup Utility, 202, 203
selecting
processor removal and replacement tool, 121
serial management (SER MGT) port
RJ-45 to DB-25 crossover pinouts, 198
RJ-45 to DB-9 crossover pinouts, 197
serial number, locating, 46
serial port sharing, configuring, 42
server
diagnosing, 27
removing from rack, 58
Summary of Contents for EXADATA X6-2
Page 1: ...Part No E62171 02 June 2016 Oracle Server X6 2 Service Manual ...
Page 2: ......
Page 12: ...12 Oracle Server X6 2 Service Manual June 2016 ...
Page 62: ...62 Oracle Server X6 2 Service Manual June 2016 ...
Page 226: ...226 Oracle Server X6 2 Service Manual June 2016 ...
Page 278: ...278 Oracle Server X6 2 Service Manual June 2016 ...
Page 284: ...284 Oracle Server X6 2 Service Manual June 2016 ...