44
Acme Packet 4500 Hardware Installation and Maintenance Guide
SYSTEM INSTALLATION
Your rack should resemble the following image.
Figure 4 - 51. Stationary Slides and Extenders Installed in Equipment Rack
Square Hole Rack
Installation
This section explains how to mount the Acme Packet 4500 mounting rail assembly
in a square hole equipment rack. You can use 10-32 cage nuts as an alternative to the
provided nut bars, but they must be mounted prior to this procedure.
To install the stationary rails on the front of a square hole equipment rack:
1.
Locate the following components:
•
2 x stationary rail sections
•
4 x 10-32 x 5/8” screws
•
2 x mounting spacers
•
2 x nut bars
2.
Align the painted side of the stationary rail with an appropriate mount point on
the front of the equipment rack.
Figure 4 - 52. Aligning the Stationary Rail with the Equipment Rack
3.
Place 2 x 10-32 screws through the mounting spacer, through the stationary rail
ear, and through the square rack rail.
4.
Hold the nut bar behind the front rack rail.
Summary of Contents for Acme Packet 4500
Page 1: ...Acme Packet 4500 Hardware Installation and Maintenance Guide Formerly Net Net 4500 April 2015...
Page 6: ...vi Acme Packet 4500 Hardware Installation and Maintenance Guide...
Page 10: ...4 Acme Packet 4500 Hardware Installation and Maintenance Guide ABOUT THIS GUIDE...
Page 14: ...8 Acme Packet 4500 Hardware Installation and Maintenance Guide SAFETY...
Page 38: ...32 Acme Packet 4500 Hardware Installation and Maintenance Guide GRAPHIC DISPLAY...
Page 74: ...68 Acme Packet 4500 Hardware Installation and Maintenance Guide STARTUP...
Page 110: ...104 Acme Packet 4500 Hardware Installation and Maintenance Guide GLOSSARY...
Page 114: ...108 Acme Packet 4500 Hardware Installation and Maintenance Guide I INDEX...