SYSTEM INSTALLATION
Acme Packet 4500 Hardware Installation and Maintenance Guide
37
•
Stationary Slide only (2 x shipped) are mounted on the equipment rack and are
used to slide a chassis into place along the chassis slides.
Figure 4 - 34. Stationary Slide
•
The chassis slide (2 x shipped) is installed onto the side of the chassis and slides
into the stationary slide to hold the chassis in an equipment rack.
Figure 4 - 35. Chassis Slide
•
The Slide Extender Kit (2 x shipped) is used to extend the length of the stationary
slide.
Figure 4 - 36. Slide Extender Kit
Summary of Contents for Acme Packet 4500
Page 1: ...Acme Packet 4500 Hardware Installation and Maintenance Guide Formerly Net Net 4500 April 2015...
Page 6: ...vi Acme Packet 4500 Hardware Installation and Maintenance Guide...
Page 10: ...4 Acme Packet 4500 Hardware Installation and Maintenance Guide ABOUT THIS GUIDE...
Page 14: ...8 Acme Packet 4500 Hardware Installation and Maintenance Guide SAFETY...
Page 38: ...32 Acme Packet 4500 Hardware Installation and Maintenance Guide GRAPHIC DISPLAY...
Page 74: ...68 Acme Packet 4500 Hardware Installation and Maintenance Guide STARTUP...
Page 110: ...104 Acme Packet 4500 Hardware Installation and Maintenance Guide GLOSSARY...
Page 114: ...108 Acme Packet 4500 Hardware Installation and Maintenance Guide I INDEX...