36
Acme Packet 4500 Hardware Installation and Maintenance Guide
SYSTEM INSTALLATION
Unpacking the Acme
Packet 4500
To unpack the Acme Packet 4500:
1.
Inspect the external packing materials and note if they are damaged in any way.
2.
Open the exterior box.
3.
Unpack the contents of the Acme Packet 4500 shipment.
4.
Locate the packing list that comes with the Acme Packet 4500 shipment, located
outside of shipment box #1.
5.
Confirm that all of the components listed in the shipping box contents tables are
present and in good condition.
If you discover that any of the parts are missing or were damaged in shipment,
send an email to [email protected] to request assistance.
Mounting Hardware
The following are images of hardware used for the Acme Packet 4500 mounting
procedures.
•
Front mounting ears (2 x shipped) are for use win fastening the chassis to the
equipment rack.
Figure 4 - 32. Front Mounting Ears
•
The mounting slide assembly (2 x shipped), as shipped, with chassis slide
inserted into stationary slide holds each side of the chassis to the equipment
rack.
Figure 4 - 33. Mounting Slide Assembly
Summary of Contents for Acme Packet 4500
Page 1: ...Acme Packet 4500 Hardware Installation and Maintenance Guide Formerly Net Net 4500 April 2015...
Page 6: ...vi Acme Packet 4500 Hardware Installation and Maintenance Guide...
Page 10: ...4 Acme Packet 4500 Hardware Installation and Maintenance Guide ABOUT THIS GUIDE...
Page 14: ...8 Acme Packet 4500 Hardware Installation and Maintenance Guide SAFETY...
Page 38: ...32 Acme Packet 4500 Hardware Installation and Maintenance Guide GRAPHIC DISPLAY...
Page 74: ...68 Acme Packet 4500 Hardware Installation and Maintenance Guide STARTUP...
Page 110: ...104 Acme Packet 4500 Hardware Installation and Maintenance Guide GLOSSARY...
Page 114: ...108 Acme Packet 4500 Hardware Installation and Maintenance Guide I INDEX...