
Chapter 1
•
Installing Hardware
30 Installing Hardware
4.
Remove the slot cover and insert the desired service board into the chosen
slot.
5.
Plug it into the bus connector and close the ejector/injector handles; you
hear a click and the Hot Swap LED turns blue when the board has been
properly inserted. The board must line up with the chassis surface.
6.
Use the 5
׳
100 Phillips screwdriver to tighten the screws on the right and
the left side of the I/O board.
7.
Wait until the Hot Swap LED turns off before using this board.
Note
y
The host controller and the switch are not hot swappable.
y
When you replace the DVB Transcoder I/O board, the associated encoder service
board resets after the new board has been installed.
y
Make sure to cover all empty slots with slot covers.
To remove boards:
All boards except the host controller and the switch can be removed and
installed while MGW 1100 is operating.
1.
If you remove a hot swappable board and MGW 1100 is running, slightly
push the red button of the right ejector/injector handle down. When the
Hot Swap LED turns blue, the board is ready to be removed.
2.
Use the 5
׳
100 Phillips screwdriver to loosen the screws on the right and
the left side of the relevant slot cover on MGW 1100’s front panel.
Loosen the screws only until you feel a click. If you unscrew any further,
you will not be able to open the injector/ejector handles.
3.
Push the red buttons on the ejector/injector handles at the same time and
open the ejector/injector handles; the board unplugs.
4.
Remove the relevant board.
5.
Cover the open slot with a slot cover and close the ejector/injector
handles; you hear a click when the slot cover has been properly inserted.
6.
Tighten the screws on the right and the left side.
StockCheck.com