143
Maintenance
Section 8-2
2.
Toggle pin 6 of the of the DIP switch of the DeviceNet Communications
Unit from OFF to ON (leave ON for 1 to 5 seconds) and then turn OFF
again (while pin 6 is ON, the TS indicator will be flashing green). The data
will start downloading and the TS indicator will flash green. (Approx. 10 s
is required for each Temperature Controller.)
■
Execution Results
• When the download completes normally, the TS indicator status returns to
be lit green.
• When the download operation ends abnormally, after error completion,
the TS indicator will flash red for 10 s.
Note
1.
For the download operation, when pin 6 (copy) is turned ON, the TS indi-
cator will flash green (indicating download standby). Check that the TS in-
dicator is flashing green before turning OFF pin 6 (copy) again.
2.
To cancel a download operation, leave pin 6 (copy) ON for at least 5 sec-
onds, and then turn OFF again.
3.
Check that data is downloading by confirming that the TS indicator flashes
green after pin 6 (copy) is turned OFF.
Copy operation mode setting
Start copying
Turn ON
pin 3
Leave pin 6 ON
for 1 to 5 s
Indicators
Lit green
Flashing green
Flashing green
TS
123456
123456
123456
NO
NO
NO
TS
TS
Summary of Contents for EJ1 - 07-2008
Page 3: ...iv...
Page 19: ...xx...
Page 33: ...14 Initial Temperature Controller Settings Section 1 4...
Page 53: ...34 Wiring the Temperature Controllers Section 3 4...
Page 101: ...82 Ladder Programming Examples Section 4 6...
Page 143: ...124 Sending Explicit Messages Section 6 5...
Page 155: ...136 Message Communications Characteristics Section 7 2...
Page 163: ...144 Maintenance Section 8 2...
Page 189: ...170 Allocation Numbers for Configurators Manufactured by Other Companies Appendix B...
Page 197: ...178 Index...