3-2
Procedure for Test Run
1. Installation and Mounting
Install the Inverter according to the installation conditions. Refer to page 2-4.
• Make sure that the installation conditions are met.
2. Wiring and Connection
Connect to the power supply and peripheral devices. Refer to page 2-6.
• Select peripheral devices that meet the specifications and wire correctly.
3. Power ON
Carry out the following pre-connection checks before turning ON the power supply.
Refer to page 3-5.
4. Checking the Display Status
Check to be sure that there are no faults in the Inverter. Refer to page 3-5.
5. Initializing Parameters
Initialize the parameters. Refer to page 3-5.
6. Setting Parameters
Set the parameters required for a test run. Refer to page 3-6.
7. No-load Operation
Start the motor without a load using the RUN Key. Refer to page 3-7.
8. Actual Load Operation
Connect the mechanical system and use the Digital Operator for operation. Refer to page 3-8.
9. Operation
Summary of Contents for EasySpeed 3G3JE
Page 1: ...3G3JE Compact Simplified Inverters Cat No I547 E1 02 USER S MANUAL...
Page 3: ...USER S MANUAL 3G3JE Compact Simplified Inverters...
Page 18: ...Table of Contents XVI...
Page 19: ...Chapter 1 Overview 1 1 Functions 1 2 Nomenclature...
Page 23: ...Chapter 2 Design 2 1 Installation 2 2 Wiring...
Page 86: ...Chapter 3 3 26 Operation...
Page 100: ...Chapter 4 4 14 Maintenance Operations...
Page 101: ...Chapter 5 Specifications 5 1 Inverter Specifications 5 2 Option Specifications...
Page 112: ...Chapter 5 5 12 Specifications...
Page 113: ...Chapter 6 Parameter Tables...
Page 118: ...Chapter 6 6 6 Parameter Tables...
Page 130: ...Chapter 7 7 12 Appendix...
Page 132: ...R 2 Revision History...