![background image](http://html1.mh-extra.com/html/omron/c200hw-srm21-v1-cs1w-srm21/c200hw-srm21-v1-cs1w-srm21_operation-manual_742333091.webp)
70
Operations Checklist
Section 3-5
and press the cover straight into the connector plug. There should not be
any gap between the cover and plug.
Inserting and Removing
Cable Connectors
The sensor cable can be inserted into the Sensor Terminal once the cable
connector has been attached.
Inserting the Cable Connector
Position the cable connector so that Terminal 1 faces you and push the con-
nector into the Sensor Terminal until it clicks into place.
Removing the Cable Connector
To remove the cable connector, first pull out the lock lever and then remove
the cable connector, as shown in the following diagram.
3-5
Operations Checklist
Go through the items in the following checklist before turning ON the Units in
the CompoBus/S System. All of the checks should be answered “Yes.”
Lock lever
Item
Check
Answer
CS-series,
C200HX/C200HG/
C200HE-(Z)E, and
C200HS Master
Units
Switch settings
Has the Master’s Special I/O Unit unit number been set?
(Refer to
for details.)
Yes
No
Has the node number been set with pin 1 of the DIP switch?
(Refer to
for details.)
Yes
No
Has the communications mode been set with pin 2 of the DIP switch?
(Refer to
for details.)
Yes
No
Are pins 3 and 4 of the DIP switch all set to OFF?
Yes
No