![background image](http://html.mh-extra.com/html/omron/c200hw-clk21/c200hw-clk21_operation-manual_742483362.webp)
337
Changing the Data Link Tables with Active Data Links
Section 10-2
6.
Use the mouse to select node 1, whose data link table is to be changed.
7.
Select
Online
−
Transfer to PLC while datalink active
.
8.
The following message box will be displayed. Click the
Yes
Button.
If the
Yes
Button is clicked, the current data link table open in CX-Net will
be compared with the data link table of the node to be changed.
If the
No
Button is clicked, the data link tables will not be compared.
After comparison, is there is any discrepancy, the following message box
will be displayed. Click the
OK
Button to check the differences.
The differences between the data link table open on CX-Net and that of the
node to be changed will be displayed.
9.
Check that the changes are correct, and click the
OK
Button.
Summary of Contents for C200HW-CLK21
Page 3: ...iv ...
Page 9: ...x ...
Page 12: ...xiii TABLE OF CONTENTS Index 367 Revision History 373 ...
Page 13: ...xiv ...
Page 19: ...xx ...
Page 57: ...32 Application Precautions Section 1 5 Example CX Programmer Response Timeout Setting ...
Page 69: ...44 Message Service Procedure Section 2 2 ...
Page 111: ...86 Constructing Networks with Repeater Units Section 3 4 ...
Page 154: ...129 Setting Data Links Section 5 2 Device Information Setting Data Link Tables ...
Page 261: ...236 Response Codes Section 6 7 ...
Page 297: ...272 Message Delay Times Section 8 4 ...
Page 353: ...328 Handling Precautions Section 9 6 ...
Page 364: ...339 Changing the Data Link Tables with Active Data Links Section 10 2 ...
Page 365: ...340 Changing the Data Link Tables with Active Data Links Section 10 2 ...
Page 369: ...344 Standard Models Appendix A ...
Page 391: ...366 Using the Relay Terminal Block Appendix C ...
Page 397: ...372 Index ...
Page 401: ...376 Revision History ...