![background image](http://html1.mh-extra.com/html/omron/3g3ax-mx2-prt-e/3g3ax-mx2-prt-e_user-manual_742058021.webp)
7
Orientation to Option Board Features
Section 2-1
SECTION 2
Option Board Mounting and Installation
2-1
Orientation to Option Board Features
2-1-1
Unpacking and Inspection
Take a few moments to unpack your new Option Board and perform these
steps:
1.
Look for any damage that may have occurred during transportation.
2.
Verify the contents of the box
3.
Inspect the markings on the Option Board. Make sure it matches the prod-
uct part number you ordered:
Option Board
with Grounding
Instruction Sheet
Warning Labels
Instruction Sheet
Blind cover
Option Board
with Grounding
Cable and Profibus connector
I111E-EN-02+3G3AX-MX2-RX-PRT+OperManual.book Seite 7 Donnerstag, 8. September 2011 11:53 11
Summary of Contents for 3G3AX-MX2-PRT-E
Page 6: ...vi...
Page 14: ...xiv Compliance with EC Directives...
Page 20: ...6 Introduction to PROFIBUS Section 1 3...
Page 36: ...22 How to mount the Option Board on the Inverter Section 2 3...
Page 42: ...28 Configuring the Network Section 3 2...
Page 70: ...56 Limitations Caused by Inverter Mode and Rating Selection Section 4 7...
Page 108: ...94 APPENDIX G...
Page 110: ...96 APPENDIX H...
Page 113: ...97...
Page 115: ......