C
REATING
A
D
ISASTER
R
ECOVERY
S
OLUTION
- 365 -
23.
If desired, click
Change...
to open the
New Job Schedule
page and define the
maintenance plan schedule.
Figure D-9:
New Job Schedule
a.
Enter a
Name
for the schedule.
b.
Select a
Schedule
type.
c.
Ensure that
Enabled
is selected.
d.
Define the
Occurrence
frequency (
Daily
,
Weekly
, or
Monthly
) and options.
e.
Define the
Daily frequency
.
f.
Define the
Duration
.
g.
Click
OK
.
S
TEP
R
ESULT
:
The changes are saved and the
New Job Schedule
page closes.
24.
Click
Next
.
S
TEP
R
ESULT
:
The
Select Report Options
page opens.
25.
Set your desired reporting options.
Summary of Contents for ZENWORKS PATCH MANAGEMENT 6.4 SP2 - SERVER
Page 1: ...User Guide ZENworks Patch Management 6 4 SP2 ...
Page 44: ...USING ZENWORKS PATCH MANAGEMENT 28 ...
Page 138: ...WORKING WITH DEPLOYMENTS 122 ...
Page 212: ...USING GROUPS 196 ...
Page 236: ...REPORTING 220 ...
Page 308: ...CONFIGURING DEFAULT BEHAVIOR 292 ...
Page 332: ...USING THE AGENT 316 The Agent Control Panel opens Figure 10 19 Agent Control Panel ...