34
Installation
Chapter 2 - Installation Guidelines
¢
A portable PC for configuring parameters using the Monitor cable (supplied
with the NPU)
¢
Other installation tools and materials
2.2.2
WiLink-I-BST-SH Chassis Slot Assignments
The Base Station chassis comprises 6 3U high slots and 9 6U high slots, as shown
in
Table 2-6
.
The Cable Tray (the installation kit is supplied with the chassis) should be
installed on the top of the chassis front to enable convenient routing of cables
connecting to power source(s), outdoor unit(s) and other equipment.
To enable power source and/or Power Interface Unit 1+1 redundancy, two PIU
modules can be installed in the designated slots. If a single PIU module is used, it
can be inserted into either one of the two available slots.
The number of installed PSU modules depends on the specific configuration
(number of AUs) and NPU redundancy scheme (refer to
Table 2-8
and
Table 2-9
).
If less than 4 PSU modules are used, they can be installed in any of the
designated slots.
The NPU should be installed in slot number 5 (slot numbers are marked on the
Cable Guide). Slot 6 is reserved for a future redundant NPU.
Slots 1-4 and 7-9 can hold up to six AU-IDU modules.
Figure 2-6: WiLink-I-BST-SH Chassis Slot Assignments
Air
Ventillation
Unit
Cable Tray
Summary of Contents for WiLink-I 3000
Page 1: ...System Manual WiLink I Modular Base Station SW Version 2 5 June 2006 ...
Page 16: ......
Page 20: ......
Page 24: ...4 System Description Chapter 1 System Description Figure 1 1 WiLink I System Architecture ...
Page 42: ......
Page 74: ......
Page 214: ......
Page 240: ......