60
Commissioning
Chapter 3 - Commissioning
Table 3-4: NPU LEDs
Name
Description
Functionality
PWR
Power indication
¢
Off - NPU is not powered
¢
Red - NPU power failure
¢
Green - NPU power is ok
ALRM
NPU Alarm indication
¢
Off - NPU is OK
¢
Red - NPU failure
BST ALRM
Base Station chassis alarm
indication
¢
Off - All Base Station modules are OK
¢
Red - Failure in one (or more) Base Station
modules
EXT ALRM
External alarm indication
¢
Off - No alarm received via the AL IN connector
¢
Red - Alarm received via the AL IN connector
MASTER
Master/Slave
(primary/secondary)
operation indication
¢
Off - Secondary NPU (backup)
¢
Green - Primary NPU
GPS/SYNC
GPS/IF clock synchronization
functionality indication
¢
Off - GPS/IF clock synchronization is disabled
¢
Green - GPS/IF clock synchronization is enabled
HOT SWAP
NPU readiness for hot-swap
removal
¢
Off: Power to the module is not disconnected, the
NPU is not ready for removal
¢
Blue: Power to the module can be disconnected
and the NPU can be safely removed
For instructions on using the HOT SWAP handles refer
to
Section 2.2.9
.
Summary of Contents for WiLink-I 3000
Page 1: ...System Manual WiLink I Modular Base Station SW Version 2 5 June 2006 ...
Page 16: ......
Page 20: ......
Page 24: ...4 System Description Chapter 1 System Description Figure 1 1 WiLink I System Architecture ...
Page 42: ......
Page 74: ......
Page 214: ......
Page 240: ......