
Installing the Base Station Equipment
WiLink-I Modular Base Station System Manual
33
2.2
Installing the Base Station Equipment
2.2.1
BST Installation Requirements
2.2.1.1
Packing List
¢
Base Station Chassis:
¯
WiLink-I-BST-SH Base Station Chassis
¯
WiLink-I-BST-AVU Air Ventilation Unit (installed)
¯
Cables Tray kit
¯
2.5 meter DC cable
¢
WiLink-I-BST-PIU (1 or 2 per chassis) Power Interface Unit(s)
¢
2.5 meter DC cable (for a redundant PIU. One cable is supplied with each
chassis)
¢
WiLink-I-BST-PSU (up to 4 per chassis) Power Supply Unit(s)
¢
WiLink-I-BST-NPU Network Processing Unit and Monitor cable
¢
WiLink-I-BST-AU-IDU (up to 6 per chassis) Access Unit Indoor Unit(s)
2.2.1.2
Additional Installation Requirements
The following items are also required to install the BST:
¢
Ethernet cable (straight) for connecting the NPU to a Hub/Switch.
¢
A grounding cable with appropriate terminations for connecting the chassis to
the rack or another ground (earth) connection.
¢
For installation in a 21" ETSI rack: Two 21" ETSI rack adapters
NOTE
The maximum length of the Ethernet cable is 100m when operating at 100 Mbps and 70m when
operating at 1 Gbps.
Summary of Contents for WiLink-I 3000
Page 1: ...System Manual WiLink I Modular Base Station SW Version 2 5 June 2006 ...
Page 16: ......
Page 20: ......
Page 24: ...4 System Description Chapter 1 System Description Figure 1 1 WiLink I System Architecture ...
Page 42: ......
Page 74: ......
Page 214: ......
Page 240: ......