Installing Windows Server 2003 x64 Editions D-21
3.
Select the adapters to include in team.
4.
Select "Adapter Fault Tolerance" or "Adaptive Load Balancing" and click [Next].
5.
Click [Finish].
6.
If necessary to set the adapter priority setting, refer the following step.
If not, go to step 7.
1. Click [Settings] tab on [TEAM:xxx #yy Properties].
2. Click [Modify Team].
3. Point to the adapter [Intel(R)PRO/1000....] and click [Set Primary] or [Set
Secondary].
4. Click [OK].
5. The setup will go back to [EAM:xxx #yy Properties] and the priority setting will
display in list ().
6. Click [OK]
7.
The setup will go back to [Intel (R) PROSet for Wired Connections] dialog box, so click
[OK].
8.
Restart the system.
Summary of Contents for Express5800/120Rj-2
Page 16: ...x This page is intentionally left blank ...
Page 19: ...Notes on Using Your Server 1 3 Internal View ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 90: ...3 24 Setting Up Your Server This page is intentionally left blank ...
Page 164: ...4 74 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Page 172: ...4 82 Configuring Your Server This page is intentionally left blank ...
Page 240: ...7 12 Maintenance This page is intentionally left blank ...
Page 354: ...9 78 Upgrading Your Server This page is intentionally left blank ...
Page 364: ...C 2 IRQ This page is intentionally left blank ...
Page 412: ...E 24 Installing Windows Server 2003 This page is intentionally left blank ...
Page 414: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 418: ...G 4 Product Configuration Record Table This page is intentionally left blank ...