9-6 Upgrading Your Server
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
NOTE:
To confirm the device you are going to maintain, use the UID
switch and the UID LED that goes on when the switch is pressed.
2.
Loosen the unlock buttons at the right and left sides of the front panel, and slowly pull out
the server from the rack.
The server is locked while you are pulling it. Stop pulling when it is locked.
To place the server in the rack, push it back into the rack while pushing the right and left release
levers (blue) forward or rearward.
IMPORTANT:
Be very careful not to get your finger caught in the
levers or rails.
Press this button to
unlock the server
Release lever (blue)
Summary of Contents for Express5800/120Rj-2
Page 16: ...x This page is intentionally left blank ...
Page 19: ...Notes on Using Your Server 1 3 Internal View ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 90: ...3 24 Setting Up Your Server This page is intentionally left blank ...
Page 164: ...4 74 Configuring Your Server 3 Setting menu for VD 0 is displayed ...
Page 172: ...4 82 Configuring Your Server This page is intentionally left blank ...
Page 240: ...7 12 Maintenance This page is intentionally left blank ...
Page 354: ...9 78 Upgrading Your Server This page is intentionally left blank ...
Page 364: ...C 2 IRQ This page is intentionally left blank ...
Page 412: ...E 24 Installing Windows Server 2003 This page is intentionally left blank ...
Page 414: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Page 418: ...G 4 Product Configuration Record Table This page is intentionally left blank ...