W415-0910 / A / 09.16.10
16
Assemble the control box as illustrated using the fasteners supplied.
ENSURE CORRECT ORIENTATION
OF SHUTTER, AS SHOWN.
ON TOP
ON BOTTOM
Main air control
box is secured
with (3) screws
into the rear
panel and (1)
through the
inside
fl
ange of
the main box
and into the
furnace top.
Summary of Contents for HYBRID 150
Page 6: ...W415 0910 A 09 16 10 6 AIR FLOW CIRCULATION AND HEAT TRANSFER COMBUSTION AIR FLOW...
Page 64: ...W415 0910 A 09 16 10 64 13 0 SERVICE HISTORY...
Page 65: ...W415 0910 A 09 16 10 65 14 0 NOTES...
Page 66: ...W415 0910 A 09 16 10 66 14 0 NOTES...
Page 72: ...W415 0910 A 09 16 10 6 CIRCULATION D AIR ET CHANGE DE CHALEUR CIRCULATION DE L AIR COMBURANT...
Page 131: ...W415 0910 A 09 16 10 65 14 0 NOTES...
Page 132: ...W415 0910 A 09 16 10 66 14 0 NOTES...