5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
84
5293079/01 EN
VACUTAP
®
VM-Ex
6. Remove the blocking strip from the coupling of the oil compartment base.
Figure 76: Oil compartment base with blocking strip
7. Lift the oil compartment by hooking up the on-load tap-changer head and
carefully move it over the selector.
8. Carefully lower the oil compartment vertically and align the position of
both coupling parts and attachment points of the oil compartment and se-
lector with one another. The correct position of the two coupling parts is
shown in the adjustment plans supplied.
9. Screw selector bracket onto oil compartment.
Figure 77: Selector with oil compartment
10.
NOTICE!
Screw tap-selector connecting leads to connecting piece with
care. Comply with specified tightening torque and secure screw connec-
tion. Failure to do so may result in damage to the on-load tap-changer
and transformer.
Summary of Contents for VACUTAP VM-Ex
Page 1: ...On load tap changer VACUTAP VM Ex Installation and commissioning instructions 5293079 01 EN ...
Page 208: ......
Page 209: ......