5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
141
5293079/01 EN
VACUTAP
®
VM-Ex
3. Press OFF test button.
ð
Flap valve is inclined. The red indicator is not visible.
Figure 162: OFF position
4. Press OPERATION test button.
ð
Flap valve is vertical. The red indicator appears in the viewing window.
Figure 163: OPERATION position
Summary of Contents for VACUTAP VM-Ex
Page 1: ...On load tap changer VACUTAP VM Ex Installation and commissioning instructions 5293079 01 EN ...
Page 208: ......
Page 209: ......