12 - 101
MELSEC-Q
12 CONTROL SUB FUNCTIONS
V
t
Ts
Tw
t
Ts
Ts
1
Feed shaft
Cutter shaft
Feed shaft
start request
Cutter shaft
start request
Start
time
Start
time
Start
time
Stop time
2
Fig. 12.54 Operation timings of system example
The cutter shaft starts from the moment the feed shaft has completed feeding the
stock "
1
", and the feed shaft starts from the moment the cutter shaft has
returned to the standby position "
2
". Actually, however, there is a delay of start
time Ts (1.5 to 2.0ms (QD75P N/QD75D N) or 6 to 7ms (QD75P /QD75D ))
from when the QD75 receives a start request until it outputs pulses. The system's
tact time can be reduced by the shortening of this delay with the Pre-reading start
function.
In Fig. 12.54, the feed shaft stands by during the stop time Tw.
Hence, pre-reading of the next data starts during the stop time Tw. If Tw is a
certain period of time, the analysis of the next data is completed during that
period, and the system is placed in an execution prohibition flag OFF waiting
status. Therefore, replacing the positioning start timing at
2
with the execution
prohibition flag OFF allows the time from when the axis operation request turns
ON until pulse output starts to be reduced to within 1.3ms
(QD75P N/QD75D N) or 3ms (QD75P /QD75D ) in the sequence program.
(Refer to Fig. 12.52.)
Summary of Contents for D75D4
Page 2: ......
Page 22: ...A 20 MEMO ...
Page 24: ...MEMO ...
Page 41: ...1 17 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 48: ...1 24 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 58: ...2 10 MELSEC Q 2 SYSTEM CONFIGURATION MEMO ...
Page 65: ...3 7 MELSEC Q 3 SPECIFICATIONS AND FUNCTIONS ...
Page 139: ...5 35 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 238: ...5 134 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 251: ...6 13 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 254: ...6 16 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 255: ...6 17 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 256: ...6 18 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 259: ...6 21 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 260: ...6 22 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 292: ...7 8 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS ...
Page 294: ...7 10 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS ...
Page 298: ...MEMO ...
Page 462: ...9 140 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 490: ...10 28 MELSEC Q 10 HIGH LEVEL POSITIONING CONTROL MEMO ...
Page 524: ...11 34 MELSEC Q 11 MANUAL CONTROL Creating the program ...
Page 666: ...14 24 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 675: ...15 9 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 716: ...15 50 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 725: ...Appendix 9 MELSEC Q APPENDICES MEMO ...
Page 878: ...Appendix 162 MELSEC Q APPENDICES 6 QD75D4N 90 23 27 4 12 98 4 46 Unit mm ...
Page 879: ...Appendix 163 MELSEC Q APPENDICES 7 QD75P1 QD75P2 QD75P4 27 4 23 98 90 4 46 unit mm ...
Page 880: ...Appendix 164 MELSEC Q APPENDICES 8 QD75D1 QD75D2 QD75D4 27 4 23 90 12 98 4 46 unit mm ...
Page 893: ...WARRANTY ...
Page 895: ......