x
Safety Precautions
WARNING
Do not disassemble or remodel the device
Handling of the cable
• Never disassemble or remodel the main unit of
the plotter and the blower unit. Disassembling/
remodeling any of them will result in electric
shocks or breakdown of the device.
• Take care not to damage, break or work on the
power cable or communication cable. If a heavy
matter is placed on the power cable, heated or
drawn, the power cable can break to cause fire
or electric shocks.
Do not use the device in damp places
Handling of tools
• Avoid damp environments when putting the
device into service. Do not splash water onto the
device.
High-humidity or water will give rise to fire,
electric shocks or breakdown of the device.
• Store cutter holders or blades in a place that is
out of the reach of children. Never place cutter
holders or blades in the tray on the operation
panel.
Abnormal event occurs
Power supply and voltage
• If the device is used under an abnormal
condition where the device produces smoke or
unpleasant smell, fire or electric shocks can
result. Be sure to turn off the power switch
immediately and detach the plug from the
receptacle. Check first to be sure that the device
no longer produces smoke, and contact a
distributor in your district or MIMAKI office for
repair. Never repair your device by yourself
since it is very dangerous for you to do so.
• This unit contains parts applied high
voltage.Carrying out electrical work by those
unauthorized for that work is prohibited.
• To prevent electrical shock, be sure to set OFF
the main power circuit breaker and disconnect
the power plug before carrying out
maintenance.For some units, capacitors may
take one minute for discharging; therefore, start
maintenance work three minutes after setting
OFF the main power circuit breaker and
disconnecting the power plug.
• Be sure to carry out grounding work to prevent
electrical shock.
• Use the unit under the power specifications
given.Be sure to connect the power cable plug
to a convenient outlet grounded, or fire or
electric shock might occur.or it may cause
electrical shock.
• The main power circuit breaker should be set
ON only by personnel with sufficient knowledge
about operations of this unit.
Leave maintenance to a serviceman
• Leave maintenance works to a serviceman
whenever the device has broken. Never conduct
maintenance works by yourself since the works
are always accompanied by possible risks of
electric shocks, etc.
Handling of the power cable
• Use a power cable attached to this unit.
• Take care not to damage, break or work on the
power cable.If a heavy matter is placed on the
power cable, heated or drawn, the power cable
can break to cause fire or electric shocks.B
Preventive measure against dust
Grounding connection
• When handling any dust-producing substance
that will jeopardize the health of personnel, wear
a mask or the like to prevent dust.
• For this device, grounding connection is needed
for prevention of an electric shock.
• Be sure to carry out grounding work.
Replacing a fuse
• For prevention of an electric shock, be sure to turn off the main power switch and pull out the power supply inlet
when replacing a fuse.
Summary of Contents for CF3-1610
Page 7: ...vi ...
Page 110: ...3 20 ...
Page 124: ...4 14 ...
Page 164: ...6 30 ...
Page 165: ...D201768 14 29062009 ...
Page 166: ...NH FW 3 30 Printed in Japan MIMAKI ENGINEERING CO LTD 2009 ...