MI 3290 Earth Analyser
Auto Sequences
®
119
12.2 Organization of
Auto Sequence®
An Auto Sequence
® is divided into three phases:
Before starting the first test, the Auto Sequence
® view menu is shown (unless it was
started directly from the Main Auto Sequence
® menu). Parameters and limits of individual
measurements can be set in this menu.
During the execution phase of an Auto Sequence
®, pre-programmed single tests are
carried out. The sequence of single tests is controlled by pre-programmed flow commands.
After the test sequence is finished, the Auto Sequence
® result menu is shown. Details of
individual tests can be viewed and the results can be saved to Memory organizer.
12.2.1 Auto Sequence
® view menu
In the Auto Sequence
® view menu, the header and the single tests of selected Auto Sequence®
are displayed. The header contains the name and description of the Auto Sequence
®. Before
starting the Auto Sequence
®, test parameters / limits of individual measurements can be changed.
Auto Sequence
® view menu (header is selected)
Name of Auto Sequence
Description of Auto Sequence
Header
Single
Test
Options
Figure 12.2: Auto Sequence
® view menu – header selected
Options
Starts the Auto Sequence
®.