page 33
Z589
Round Baler
7.6 PREPARING FOR WORK
Before starting your work with the machine, prepare it according to the planned task.
7.6.1 INSTALLING THE CORD
To assure proper performance of the cord wrapper, use a PP (propylene) cord rated between 500 and 75 or 1000
(m/kg).
The round baler cord wrapper is compatible with other cord grades.
•
Open the side right-hand guard panel and install the cord hanks in the cord cartridges.
•
Tie the cord hanks together (3 + 3) so that the
cord passes the separator holes and magazine
mouth rings.
•
Pass the ends of two cords through the cord
brake
F1
.
•
Pass the two cords through the eyelets
O
in the
direction indicated on the diagram.
•
Make a full turn over the two wheels
R
located
in front of the right-hand side belt (as shown in
the diagram). The wheels indicate that the bale
is being wrapped with the cord.
Summary of Contents for Z589
Page 130: ...page 127 Z589 Round Baler...
Page 143: ...page 140 Z589 Round Baler Notes...
Page 144: ...page 141 Z589 Round Baler...