page 121
Z589
Round Baler
11.3 MAINTENANCE
The procedures explained below must be completed in the beginning and at the end of each work season.
When relubricating or regreasing follow all the procedures explained in Chapter 9 "Maintenance and adjustment".
PROCEDURES
DAYS
MONTHS
BALES
Check the condition of bearings, (pivot) pins and shafts.
7
Check the chain tension.
3
Check the frame bearings and the frame leaf spring bushings.
7
Check the pickup cam and prongs.
1
Check the roller fastening bolts of the main and side belt tensioning arms.
7
Check the belts and their tensioners.
1
Check the tyre pressure.
1
Check that no lift, hydraulic hose or connectors leak.
7
Check the transmission oil level.
1
1000
Check the oil filter of the automatic lubrication system.
12
Check the blade sharpness, sharpen if necessary (Z589-2 only).
300
Do a functional test of the road light electrical system.
1
Check all sensors and wiring.
6
Check the proper tightening of bolts and nuts.
1
Check all welded joints.
12
Check the condition of all warning stickers (symbols).
1
Check the guard panels and safety equipment.
1
•
Relubricate according to the schedule listed in Table 11.2 "Lubrication procedures".
•
Thoroughly clean the machine in the beginning and at the end of each work season.
Summary of Contents for Z589
Page 130: ...page 127 Z589 Round Baler...
Page 143: ...page 140 Z589 Round Baler Notes...
Page 144: ...page 141 Z589 Round Baler...