page 41
Z589
Round Baler
8 FIELD WORK OF THE MACHINE
8.1 STARTUP
Once the machine has been prepared according to Chapter 7 "Operating Manual", turn on the F Bus to start your
work.
You can review and modify the machine settings on the control terminal before work.
Check that the cord wrapper arm is home and that the required cutting tools are released (unlocked) before
starting your work.
Park the tractor with the machine in front of the row end, open the pickup cut-off valve (set to
OPEN
) and lower
the pickup. Make sure that the baler gate is closed and locked. The hydraulic pressure gauge must read at least
30 bar
.
Now you can start the PTO and start collecting the product.
The PTO speed must be 450÷540 RPM.
DO NOT exceed the maximum RPM value.
See the following Chapters for more information about modifying the F Bus control system programs:
•
10-ET EasyTronic.
8.2 DRIVING SPEED
Adapt the driving speed to the product being processed and the terrain.
8.3 BALING CHAMBER CHARGING (optional accessory kit)
If the baler is equipped with the load indicators and the load indication function is on, you can monitor how the
product is charged into the baling chamber.
See the following Chapters for more information on how to charge the baling chamber with the load indicator kit:
•
EasyTronic = 10-ET.7 Work stages.
8.4 BALING
You can monitor the baling stages with the F Bus system, e.g.:
•
Bale diameter
•
Wrapping tie type (cord or net)
•
Wrapping control (automatic or manual)
If the machine is equipped with the cutting assembly (Z589-2 only), you can also use the control system to
monitor the following:
•
Blades (extended / retracted)
Once the programed bale diameter is produced, F Bus will warn you to immediately stop driving so that the
wrapper can tie the bale.
See the following Chapters for more information about the baling stages:
•
10-ET EasyTronic.
Summary of Contents for Z589
Page 130: ...page 127 Z589 Round Baler...
Page 143: ...page 140 Z589 Round Baler Notes...
Page 144: ...page 141 Z589 Round Baler...