STANDARD TEST PROCEDURE
AVTM246004 BITE 2/2P Rev 4 July 2011
41
5.
When the strap value displayed on the screen stabilizes,
pull the trigger on the
receiver
to store the reading.
The measurements are stored in the
receiver
.
The
receiver
now displays the digits 002 in the top left corner
of the test screen. This means that you are ready to test
cell #2.
If you are testing a sectioned
battery string and want to test
the next section, refer to the
following subsection,
“Measuring the Next Section of
a Sectioned Battery String,” for
the appropriate procedures.
6.
Continue to measure the other cells and straps in the
string.
7.
After the last cell, the
receiver
expects a strap result.
Short the receiver and potential probe together and pull
the trigger. This saves the last cell’s data or else it will be
lost.
8.
When you are finished measuring all the cells and straps,
press
on the
receiver
to complete the test.
The
receiver
prompts you to confirm that the test is complete.
Y
TEST COMPLETE
N
(Y/N)?
MENU
Review the test information that
is stored in the
receiver
. You
can scroll through the results
and, if needed, retest individual
cells and straps. Refer to
"Reviewing a Test” on page
43.
9.
Press
on the
receiver
to enter Y (for YES).
The
receiver
prompts you again to confirm that the test is
complete.
Y
ARE YOU SURE
N
(Y/N)?
MENU
10.
Press
on the
receiver
to enter Y (for YES).
The
receiver
displays a screen to indicate that the test is
complete.
DONE!
For instructions on what to do following the test, see "Step
Eight: What to Do When the Test Is Complete” on page 43.
www.
GlobalTestSupply
.com
Find Quality Products Online at: