M
AVTM246004 BITE 2/2P Rev 4 July 2011
102
P
Performing tests, 25
splitting the strap, 33
taking measurements, 38
Power source
required connection, 11
power switch, 9
Power switch
receiver, 18
transmitter, 15
Powering down the BITE 2/2P, 45
R
Ready indicator, 15
Receiver
options, 67
powering down, 45
selecting the language, 69
setting the clock, 69
Replacing batteries
receiver, 75
S
S1 power switch, 15
Safety requirements, 9
Sectioning a battery, 49
with parallel strings, 51
Splitting the strap, 33
Strap
splitting, 33
taking measurements, 38
T
Temperature
corrections, 64
Test procedures, 25
Time
setting in the receiver, 69
Transmitter
powering down, 45
V
Voltage Selection, 17
W
Wand
7-PIN connector, 21
www.
GlobalTestSupply
.com
Find Quality Products Online at: