
M
AVTM246004 BITE 2/2P Rev 4 July 2011
28
Step Two: Powering-on the Receiver
After you successfully perform the pretest activities described
Step One, you are ready to power on the
receiver
.
POWER ON
Switch
ENTER Key
7-Pin
Connector
4-Pin
Connector
Potential
Probe
3-Pin
Connector
LCD
TRIGGER
UP and
DOWN
ARROW
Keys
Figure 4-1: Receiver controls, connectors and indicators
1.
Make sure the
receiver
charger is disconnected from the
receiver.
NOTE:
Do not use the
receiver
to perform tests while the
charger is connected to the receiver.
2.
Connect the
potential probe
cable assembly
to the 7-pin
connector on the
receiver
.
3.
Press the POWER ON switch on the
receiver
.
The
receiver
powers on and displays several initialization
screens.
www.
GlobalTestSupply
.com
Find Quality Products Online at: