Shutdown
44
BA-42820-02-V03
Water sampling station
EASYPRO
Operating instructions
10 Shutdown
10.1 Short-term shutdown
Short-term shutdown involves deactivation for the calibration of the
measured values or for maintenance work, for example. For long-term
shutdown, see section 10.2 „Long-term shutdown“ on page 44.
Perform the following work steps:
1.
Close the inflow tap (Fig. 2 „Water sampling station EASYPRO 4“ on
page 10, pos. 5) of the water sampling station or switch off the
sample water supply externally. This interrupts the measurement and
the control of the
TOPAX
®
MC
controller, and the sample water circuit
can be opened.
2.
Disconnect the
TOPAX
®
MC
controller's external power supply.
3.
Perform the planned work on the water sampling station.
4.
Reconnect the
TOPAX
®
MC
controller's external power supply.
5.
Open the inflow tap of the water sampling station or switch the sam-
ple water supply back on externally. It starts the measurement and
regulation.
ü
The water sampling station was deactivated and re-activated
(short term).
10.2 Long-term shutdown
This section describes the required actions in the event of long-term shut-
down in order to ensure the functionality of the water sampling station.
Perform the following work steps:
1.
Close the inflow tap (Fig. 2 „Water sampling station EASYPRO 4“ on
page 10, pos. 5) of the water sampling station or switch off the
sample water supply externally. This interrupts the measurement and
the control of the
TOPAX
®
MC
controller, and the sample water circuit
can be opened.
2.
Disconnect the
TOPAX
®
MC
controller's external power supply.
3.
Pinch off all cables in the
TOPAX
®
MC
controller.
4.
Uncouple the ingoing hose connection from the inflow tap and from
the sample water filter (Fig. 2 „Water sampling station EASYPRO 4“
on page 10, pos. 3), as well as the outgoing hose connection from
the outflow tap (Fig. 2 „Water sampling station EASYPRO 4“ on page
10, pos. 12) and the measuring cell valve.
5.
Unscrew the black screw caps from the underside of the valves and
allow the sample water to drain out of the valves.
6.
Now immediately take the measuring cells out of the valves and store
them stood upright in a 3-molar potassium chloride solution.
ü
The water sampling station has been shut down over the long
term.
10.3 Storage
Pre-conditions for actions:
ü
The product was shut down in accordance with section 10.2 „Long-
term shutdown“ on page 44.
Storing the water sampling station correctly extends its service life. You
should avoid negative influences such as extreme temperatures, high hu-
midity, dust, chemicals, etc.
Unscrew the from the wall holder and store them away.
Ensure ideal storage conditions where possible:
n
The storage place must be cold, dry, dust-free and generously venti-
lated
n
temperatures b 0 °C and + 50 °C
n
Relative air humidity must not exceed 90 %
10.4 Transportation
Pre-conditions for actions:
ü
The water sampling station has been shut down in accordance with
chapter 10.2 „Long-term shutdown“ on page 44.
n
The water sampling station may only be transported in an empty state.
n
Avoid heavy blows at all costs.
If the device is sent back to the manufacturer, please follow section 16
„Declaration of no objection“ on page 59 and section 17 „Warranty
claim“ on page 60.
10.5 Disposal
n
The product must be disposed of in accordance with applicable local
laws and regulations. It should not be disposed of as domestic waste!
n
As the disposal regulations may differ from country to country, please
consult your supplier.
n
In Germany, the manufacturer must provide free-of-charge disposal
Provided the product has been safely returned along with a declara-
tion of no objection (chapter 16 „Declaration of no objection“ on page
59).