Page 19 Leica EM TIC 3X Operating Manual 07/17
3.3
Installing, assembling and commissioning
3.3.1 Unpacking and installing on a table
The Leica EM TIC 3X Triple Ion Beam Cutter system should be transported with a
forklift truck.
After selecting the installation location, remove and store the outer packaging. Check
the disassembled components that are secured on the housing, to ensure that
nothing is missing or damaged.
To unpack the system, proceed as follows:
1. Remove the packaging straps around the crate containing the
Leica EM TIC 3X Triple Ion Beam Cutter system.