Sierra
M6
‐
2
SAS/SATA
Protocol
Analyzer
User
Manual
19
LEDs
LeCroy
Corporation
Figure 1.2: Front Panel
LEDs
Each
link
is
supported
by
LEDs
with
the
following
functionality:
Green
This
LED
is
illuminated
during
the
OOB
sequence
before
the
link
is
established
and
after
link
is
established
it
indicates
traffic
on
the
bus.
Orange
This
LED
is
illuminated
as
follows:
Speed
Initiator
Target
1.5G
Off
Off
3.0G
On
Off
6.0G
On
On
Yellow
This
LED
is
illuminated
when
a
link
is
established.
Red
This
LED
illuminates
when
an
error
occurs.
Blue
This
LED
is
illuminated
when
a
trigger
occurs.
Figure 1.3: LEDs
Status and Configuration Display
The
Analyzer
front
LCD
display
indicates
the
configuration
and
status
of
operations.
For
example,
during
initialization,
the
LCD
panel
displays
boot
status
messages.