A - 8
Appendix
7. Lift up rear side-barriers (2) and assemble connection
plate (1). Secure connection with flat round bolt (3) and
securing nuts.
Assembly of tarpaulin:
• Push tubes (4) through the seam of the tarpaulin (5).
• Assemble tarpaulin (5) as shown.
• Secure tubes (4) with linch pins (6).
5
1
3
3
4
2
6
6XLD0006
(on execution with 2 metering rollers)
1
3
2
6XLD0007
4
5
(on execution with 3 metering rollers)
8.
• Insert tube (1) and rod (2) into tarpaulin (3).
• Screw retainer (4) with flat round bolts and nuts onto
plate.
• Assemble tarpaulin (3) as shown.
• Secure tubes (1) and rod (2) with linch pin.
Summary of Contents for 5XL-GD
Page 4: ...Foreword ...
Page 12: ...I 4 General information ...
Page 17: ...II 5 Safety ...
Page 22: ...II 10 Safety ...
Page 76: ...IV 38 Comfort Control Unit ...
Page 102: ...VII 2 Overwintering ...
Page 104: ...VIII 2 Recommissioning ...
Page 106: ...IX 2 Faults causes and removal ...
Page 124: ...A 18 Appendix ...
Page 125: ...A 19 Appendix ...