III - 13
Operation
b)
3.10.2.3
For the electromagnetic operator-
friendly control unit with automatic
loader
• When starting the loading process, switch on the
hydraulic oil circulation on the tractor and arrest the
switch lever.
• Switch the Pick-up switch to "Lower".
The pick-up can be run in this floating position during
the entire loading process.
• Switch on automatic loader (the time delay should be
adjusted to the type of loading (chapter 4.7.3))
dry
=
high time delay
damp
=
low time delay
• Switch on the power take-off shaft and start the loading
process.
When starting the loading process, switch on the
scraper-floor advance when the loading material has
reached approx. 3/4 of the total height in order to
prevent the pile from tipping over.
When the loading height has been reached, the scraper
floor switches on automatically until the message „Wagon
full“ appears on the display and the hooter gives a short
tone.
3.10.3
Finishing the loading process
Make sure that the laden weight shown on
the serial plate is not exceeded.
Loading finishes when::
– The message „Wagon full“ appears on the display and
– the horn gives a short tone at the same time
After the loading process has finished, carry out the
following functions one after the other:
• Allow the conveyor unit to continue running.
• Raise the pick up.
• Switch off the power take off shaft.
• Switch off the electrical control system.
• Switch off the hydraulic system.
Summary of Contents for 5XL-GD
Page 4: ...Foreword ...
Page 12: ...I 4 General information ...
Page 17: ...II 5 Safety ...
Page 22: ...II 10 Safety ...
Page 76: ...IV 38 Comfort Control Unit ...
Page 102: ...VII 2 Overwintering ...
Page 104: ...VIII 2 Recommissioning ...
Page 106: ...IX 2 Faults causes and removal ...
Page 124: ...A 18 Appendix ...
Page 125: ...A 19 Appendix ...