A - 6
Appendix
A1.3
Assembling the
superstructure
Preparation
• Secure the tractor and feeder wagon against rolling
away.
• Support the wagon by its supporting foot.
• If the tractor is coupled and connected to the wagon,
switch off the engine, apply the brake and remove the
ignition key.
• Enter the wagon by the side door.
• Assemble the upper panels.
Assembly must be carried out by at
least two people.
1) Lift up tube bail (4) and fixate in upright position.
Assemble front tubes (5) with 2 screws M16x80.
3) Lift up front barrier.
2) Supply rear tube bails (4) on each side with bail (3),
screw (1) and nut (2).
TR000013
1
TR000012
2
1
3
6XL00008
5
4
4
Summary of Contents for 5XL-GD
Page 4: ...Foreword ...
Page 12: ...I 4 General information ...
Page 17: ...II 5 Safety ...
Page 22: ...II 10 Safety ...
Page 76: ...IV 38 Comfort Control Unit ...
Page 102: ...VII 2 Overwintering ...
Page 104: ...VIII 2 Recommissioning ...
Page 106: ...IX 2 Faults causes and removal ...
Page 124: ...A 18 Appendix ...
Page 125: ...A 19 Appendix ...