Seatex Seapath 200 Installation Manual, rev. 13
Installation
26
|-----------------------------User side x1-----------------------------|
pin signal description
pin signal description
1
PWRIN+ power +
23 XIN to MRU
2
PWRIN- power gnd 24 LGND gnd ref.aux.+dig
3
TX+ from MRU 27 SHUTOFF of MRU
4
TX- -"-
5
RX+ to MRU
6
RX- -"-
3.
Connect the cables for output data from Seapath to external equipment to the ports com5,
6, 7 or com8 for RS-232 or 422 communication (RS-232 is the default setting), analog
output signals on the AUX – Serial port or the Ethernet connection. If additional serial
ports are required the ports com13to com16 available on the "AUX - Serial" port can be
used, see chapter 3.4.3.3 for instructions.
4.
Connect the 110/230V AC ship's power supply to the Seapath power connector at the rear
of the Processing Unit.
5.
Connect the cable from the Video Display Unit and the keyboard to the corresponding
connectors at the rear of the Processing Unit.
6.
Connect the Video Display Unit to 110/230V AC ship's power.
7.
If available, connect the cables with the DGPS corrections to port com10 and the external
gyro compass signal to com9 at the rear of the Processing Unit. Optionally, additional
DGPS correction signals can be connected to the free communication ports in the range 5
to 9 instead of output lines and gyro input.
8.
When all cables are connected, power on the Processing Unit. The four LED indicators
located behind the door on the front panel of the Processing Unit should then start to shine
red. The LED1 light diode in the MRU junction box should then shine green indicating
that the MRU receives power. A yellow light in LED2 indicates that digital data are sent
from the MRU on TX+.
9.
If the lights in the LED1 and 2 in the MRU junction box are shining, the installation is
now completed and you can continue to set up the configuration parameters.
Summary of Contents for Seatex Seapath 200
Page 1: ...Seatex Seapath 200 Installation Manual Issued 2008 06 09 ...
Page 2: ...Blank page ...
Page 4: ...IV Blank page ...
Page 6: ...VI Blank page ...
Page 10: ...X Blank page ...
Page 14: ...XIV Blank page ...
Page 18: ...Seatex Seapath 200 Installation Manual rev 13 Introduction 4 Blank page ...
Page 22: ...Seatex Seapath 200 Installation Manual rev 13 Specifications 8 Blank page ...
Page 53: ...Seatex Seapath 200 Installation Manual rev 13 Installation drawings 39 ...
Page 54: ...Seatex Seapath 200 Installation Manual rev 13 Installation drawings 40 ...
Page 55: ...Seatex Seapath 200 Installation Manual rev 13 Installation drawings 41 ...
Page 56: ...Seatex Seapath 200 Installation Manual rev 13 Installation drawings 42 ...
Page 64: ...Seatex Seapath 200 Installation Manual rev 13 Appendix A Installation worksheet 50 Blank page ...
Page 80: ...Seatex Seapath 200 Installation Manual rev 13 Appendix C Installation of coax connectors 66 ...
Page 81: ...Seatex Seapath 200 Installation Manual rev 13 Appendix C Installation of coax connectors 67 ...
Page 82: ...Seatex Seapath 200 Installation Manual rev 13 Appendix C Installation of coax connectors 68 ...
Page 83: ...Seatex Seapath 200 Installation Manual rev 13 Appendix C Installation of coax connectors 69 ...