1.6 Electrical Installation
Pinout for the connector can be found in chapter "Connector Pinout" from (
# 200). Pinout
of the servo amplifier's end can be found in the instructions manual of the servo amplifier.
1.6.1 Important notes
Only staff qualified and trained in electrical engineering are allowed to wire up the motor.
DANGER
Always make sure that the motors are de-energized during assembly and
wiring, i.e. no voltage may be switched on for any piece of equipment
which is to be connected.
There is a risk of death or severe injury from touching exposed contacts.
Ensure that the switch cabinet remains turned off (barrier, warning signs
etc.). The individual voltages will only be turned on again during setup.
Never undo the electrical connections to the motor while it is energized.
Risk of electric shock! In unfavorable circumstances, electric arcs can
arise causing harm to people and damaging contacts.
A dangerous voltage, resulting from residual charge, can be still present
on the capacitors up to 10 minutes after switch-off of the mains supply.
Even when the motor is not rotating, control and power leads may be live.
Measure the DC-link voltage and wait until it has fallen below 60V.
The ground symbol
, which you will find in the wiring diagrams, indicates that you must
provide an electrical connection, with as large a surface area as possible, between the unit
indicated and the mounting plate in the switch cabinet. This connection is to suppress HF
interference and must not be confused with the PE (protective earth) symbol
(protective
measure to EN 60204).
To wire up the motor, use the wiring diagrams in the Installation and Setup Instructions of the
servo amplifier which is used.
AKM Installation | 1 English
Kollmorgen | kdn.kollmorgen.com | June 2018
23
Summary of Contents for AKM
Page 37: ...2 3 3 Typenschl ssel AKM Installation 2 Deutsch Kollmorgen kdn kollmorgen com June 2018 37...
Page 119: ...5 3 3 Cl de type AKM Installation 5 Fran ais Kollmorgen kdn kollmorgen com June 2018 119...
Page 138: ...AKM Installation 5 Fran ais 138 Kollmorgen kdn kollmorgen com June 2018...
Page 142: ...AKM Installation 6 100 C 40 C PE 60 142 Kollmorgen kdn kollmorgen com June 2018...
Page 147: ...6 3 3 AKM Installation 6 Kollmorgen kdn kollmorgen com June 2018 147...
Page 161: ...6 6 200 6 6 1 10 60 PE EN 60204 AKM Installation 6 Kollmorgen kdn kollmorgen com June 2018 161...
Page 163: ...6 7 6 7 1 900 10 60 100 C 40 C AKM Installation 6 Kollmorgen kdn kollmorgen com June 2018 163...
Page 164: ...AKM Installation 6 6 7 2 1 2 3 4 24 5 6 7 8 9 164 Kollmorgen kdn kollmorgen com June 2018...
Page 165: ...6 7 3 AKM Installation 6 Kollmorgen kdn kollmorgen com June 2018 165...
Page 210: ...AKM Installation 11 Record of document revisions 210 Kollmorgen kdn kollmorgen com June 2018...
Page 211: ...AKM Installation 11 Record of document revisions Kollmorgen kdn kollmorgen com June 2018 211...