1-3
1.4
Control and Indicator Operational Performance Test
The following operational performance test is designed to ensure each of the
MRidium 3860+'s
controls and indicators is functioning properly, and to
check the operability of all the features available in the normal operating
modes. These tests and associated procedures are presented in a sequence
that provides an efficient, qualitative check of instrument operability.
Test Requirements
The following items of laboratory equipment and supplies are required to
conduct the operational performance tests:
1. IRadimed 1056 administration set.
2. IV Solution Container.
3. Standard IV Pole.
4. Hemostat.
5. Empty fluid container.
6. Infutest 2000 (or equivalent)
7. Pronk Technologies OxSim, OX-1 SpO
2
Finger Simulator (or equivalent).
1.4.1 Power Indicator
Mount MRidium 3860+ on IV pole With External DC Power/Charger
(1120) power cord (1121) to line power, DC Charger cable connected
from External DC Power/Charger (1120) to 3860 pump DC input
remove 1133 Battery Pack from Pump and verify LED below power on/
off switches is illuminated Green. Reinstall 1133 Battery Pack and verify
LED below power on/off switches is illuminated Yellow or Amber.
1.4.2 Initialization
Power on using overlay (IVP-0010) On (I) button. Verify the following
initial display with current Software revision:
IRI LOADER FLASHER
© 201X
MS03 ”Day””Month””YR” HR:Min:Sec
MS01 ”Day””Month””YR” HR:Min:Sec
NO CARD DETECTED
followed by:
Powering On
X.X.XXXX
(X.X.XXXX = Current software revision)
followed by:
Normal pump display (Figure 1-1). Verify display is clear and readable.
Summary of Contents for MRidium 3860
Page 2: ......
Page 4: ...1 4...
Page 8: ...iv...
Page 34: ...1 26...
Page 50: ...2 16...
Page 71: ...3 21 Figure 3 2...
Page 88: ...3 38 Figure B Too Much Taper Raw Curve 3860 61 Figure C Not Enough Taper Raw Curve 3860 61...
Page 95: ...3 45 Return the Stop Cock to the Test Position...
Page 106: ...4 2 Figure 4 1...